12.10.090 Relocation expenses.
This section is included in your selections.
A. The cost of relocation of any utility located pursuant to a valid permit as required by the city for a public purpose shall be borne by the city, unless listed in subsection B of this section.
B. A utility shall bear the cost of relocation in the following circumstances:
1. Any relocation required as a result of a violation of permit conditions at the time of the original construction; or
2. Installed by a utility without a valid permit; or
3. Installed at a location other than the location authorized in the permit; or
4. Because the utility does not otherwise meet the requirements of this chapter. [Ord. 15-01 § 3.]