Skip to main content
Loading…
This section is included in your selections.

A. The cost of relocation of any utility located pursuant to a valid permit as required by the city for a public purpose shall be borne by the city, unless listed in subsection B of this section.

B. A utility shall bear the cost of relocation in the following circumstances:

1. Any relocation required as a result of a violation of permit conditions at the time of the original construction; or

2. Installed by a utility without a valid permit; or

3. Installed at a location other than the location authorized in the permit; or

4. Because the utility does not otherwise meet the requirements of this chapter. [Ord. 15-01 § 3.]