Skip to main content
Loading…
This section is included in your selections.

A. Damaging, tampering with or removing of life rings is prohibited.

B. Removal of the seawall fence for access to moored vessels may only be done with the permission of the port director.

C. Replacement of the seawall fence is the responsibility of the permit holder, and must be replaced whenever the vessel is not at its mooring space.

D. The permit holder is responsible for damage to the seawall fence at the assigned space for the period of the permit.

E. No modifications to the seawall fence are permitted without the approval of the port director, and the fence must be restored to its original form at the end of the period of the permit, unless otherwise authorized by the port director. [Ord. 17-11 § 2.]